• About us
  • Contact us
  • Guest Post
  • Home
  • Paid Sponsor Post
  • Privacy Policy
  • Terms and Conditions
No Result
View All Result
Modre News
Thursday, February 9, 2023
  • Home
  • Latest News
  • Business
  • Education
  • News
  • Tech
  • Entertainment
  • Lifestyle
  • Shopping News
  • Movie
  • Music
  • World
Modre News
No Result
View All Result
Home Latest News

Govt votes N21bn to modernise railway operations

admin by admin
January 25, 2023
in Latest News
Reading Time: 2 mins read
0
0
SHARES
0
VIEWS
Share on FacebookShare on Twitter


The Federal Government has earmarked the sum of N21.09bn for railway modernisation, rehabilitation and maintenance of ongoing railway projects nationwide.

An analysis of the 2023 Appropriation Act by The PUNCH showed that the railway modernisation project under the line item with code ERGP13195543 was allocated the sum of N10bn.

Also, rehabilitation of the narrow-gauge track from Minna to Barrow with extension to the Baro River Port would gulp N1.186bn and the maintenance of roads into stations, restrooms, workshops, chalets and operational residential quarters would cost N200m.

The sum of N500m was allocated to the maintenance of the track including emergency recovery, recovery bridge and culvert repair; rehabilitation of the station and other railway buildings would be done at the cost of N500m.

Likewise, the building of the station platform and canopy at km31 at Itakpe-Aladja was allocated the sum of N575m.

Other railway projects include procurement/rehabilitation of rolling stock narrow gauge at the cost of N3.734bn; insurance of locomotive and rolling stock at N500m; procurement of diesel (AGO) for the power cars and locomotive at the cost of N710m while rehabilitation of stations and other railway buildings was allocated the sum N500m.

Further breakdown of the budget showed that the sum of N500m was allocated for the procurement of track materials; procurement of rail inspection vehicles to cost N500m; rehabilitation/ repairs of railways under the line item with code 23030114 at the cost of N2.186bn while rehabilitation/repairs of office buildings under line item with code 23030121 were allocated the sum of N1bn.

The President, Major General Muhammadu Buhari (retd.), while presenting the 2023 Appropriation Bill to the National Assembly last year, said that appreciable progress had been made in the rehabilitation and completion of key projects like the 156km Lagos-Ibadan Standard Gauge Rail (and its 8.72km extension to Lagos Port); the 186km Abuja-Kaduna Standard Gauge Rail; and 327km Itakpe-Warri Standard Gauge Rail, adding that significant investment was made to finance these projects.

Buhari noted that the completed projects complemented the administration’s ongoing investments in light rail, narrow- and standard-gauge rail, ancillary facilities yards, wagon assembling plants, e-ticketing infrastructure as well as the training and development of rail engineers and other workers.

The PUNCH reported that the government planned to spend $16bn on modernising rail and port infrastructure across the country.

However, the President of the Nigerian Union of Rail Workers, Innocent Ajiji in an interview with our correspondent last year said even though railway modernisation was a good idea, Nigeria was not closed to modern railways.


Source link


The Federal Government has earmarked the sum of N21.09bn for railway modernisation, rehabilitation and maintenance of ongoing railway projects nationwide.

An analysis of the 2023 Appropriation Act by The PUNCH showed that the railway modernisation project under the line item with code ERGP13195543 was allocated the sum of N10bn.

Also, rehabilitation of the narrow-gauge track from Minna to Barrow with extension to the Baro River Port would gulp N1.186bn and the maintenance of roads into stations, restrooms, workshops, chalets and operational residential quarters would cost N200m.

The sum of N500m was allocated to the maintenance of the track including emergency recovery, recovery bridge and culvert repair; rehabilitation of the station and other railway buildings would be done at the cost of N500m.

Likewise, the building of the station platform and canopy at km31 at Itakpe-Aladja was allocated the sum of N575m.

Other railway projects include procurement/rehabilitation of rolling stock narrow gauge at the cost of N3.734bn; insurance of locomotive and rolling stock at N500m; procurement of diesel (AGO) for the power cars and locomotive at the cost of N710m while rehabilitation of stations and other railway buildings was allocated the sum N500m.

Further breakdown of the budget showed that the sum of N500m was allocated for the procurement of track materials; procurement of rail inspection vehicles to cost N500m; rehabilitation/ repairs of railways under the line item with code 23030114 at the cost of N2.186bn while rehabilitation/repairs of office buildings under line item with code 23030121 were allocated the sum of N1bn.

The President, Major General Muhammadu Buhari (retd.), while presenting the 2023 Appropriation Bill to the National Assembly last year, said that appreciable progress had been made in the rehabilitation and completion of key projects like the 156km Lagos-Ibadan Standard Gauge Rail (and its 8.72km extension to Lagos Port); the 186km Abuja-Kaduna Standard Gauge Rail; and 327km Itakpe-Warri Standard Gauge Rail, adding that significant investment was made to finance these projects.

Buhari noted that the completed projects complemented the administration’s ongoing investments in light rail, narrow- and standard-gauge rail, ancillary facilities yards, wagon assembling plants, e-ticketing infrastructure as well as the training and development of rail engineers and other workers.

The PUNCH reported that the government planned to spend $16bn on modernising rail and port infrastructure across the country.

However, the President of the Nigerian Union of Rail Workers, Innocent Ajiji in an interview with our correspondent last year said even though railway modernisation was a good idea, Nigeria was not closed to modern railways.


Source link

RelatedPosts

LP chieftain defects to PDP in Ebonyi

February 8, 2023

Nigerians will hold leaders accountable at ballot—Osinbajo

February 7, 2023

World mourns as earthquake kills over 2,700 in Turkey, Syria

February 7, 2023

JAMB nabs corps member, others over registration infractions

February 6, 2023


The Federal Government has earmarked the sum of N21.09bn for railway modernisation, rehabilitation and maintenance of ongoing railway projects nationwide.

An analysis of the 2023 Appropriation Act by The PUNCH showed that the railway modernisation project under the line item with code ERGP13195543 was allocated the sum of N10bn.

Also, rehabilitation of the narrow-gauge track from Minna to Barrow with extension to the Baro River Port would gulp N1.186bn and the maintenance of roads into stations, restrooms, workshops, chalets and operational residential quarters would cost N200m.

The sum of N500m was allocated to the maintenance of the track including emergency recovery, recovery bridge and culvert repair; rehabilitation of the station and other railway buildings would be done at the cost of N500m.

Likewise, the building of the station platform and canopy at km31 at Itakpe-Aladja was allocated the sum of N575m.

Other railway projects include procurement/rehabilitation of rolling stock narrow gauge at the cost of N3.734bn; insurance of locomotive and rolling stock at N500m; procurement of diesel (AGO) for the power cars and locomotive at the cost of N710m while rehabilitation of stations and other railway buildings was allocated the sum N500m.

Further breakdown of the budget showed that the sum of N500m was allocated for the procurement of track materials; procurement of rail inspection vehicles to cost N500m; rehabilitation/ repairs of railways under the line item with code 23030114 at the cost of N2.186bn while rehabilitation/repairs of office buildings under line item with code 23030121 were allocated the sum of N1bn.

The President, Major General Muhammadu Buhari (retd.), while presenting the 2023 Appropriation Bill to the National Assembly last year, said that appreciable progress had been made in the rehabilitation and completion of key projects like the 156km Lagos-Ibadan Standard Gauge Rail (and its 8.72km extension to Lagos Port); the 186km Abuja-Kaduna Standard Gauge Rail; and 327km Itakpe-Warri Standard Gauge Rail, adding that significant investment was made to finance these projects.

Buhari noted that the completed projects complemented the administration’s ongoing investments in light rail, narrow- and standard-gauge rail, ancillary facilities yards, wagon assembling plants, e-ticketing infrastructure as well as the training and development of rail engineers and other workers.

The PUNCH reported that the government planned to spend $16bn on modernising rail and port infrastructure across the country.

However, the President of the Nigerian Union of Rail Workers, Innocent Ajiji in an interview with our correspondent last year said even though railway modernisation was a good idea, Nigeria was not closed to modern railways.


Source link


The Federal Government has earmarked the sum of N21.09bn for railway modernisation, rehabilitation and maintenance of ongoing railway projects nationwide.

An analysis of the 2023 Appropriation Act by The PUNCH showed that the railway modernisation project under the line item with code ERGP13195543 was allocated the sum of N10bn.

Also, rehabilitation of the narrow-gauge track from Minna to Barrow with extension to the Baro River Port would gulp N1.186bn and the maintenance of roads into stations, restrooms, workshops, chalets and operational residential quarters would cost N200m.

The sum of N500m was allocated to the maintenance of the track including emergency recovery, recovery bridge and culvert repair; rehabilitation of the station and other railway buildings would be done at the cost of N500m.

Likewise, the building of the station platform and canopy at km31 at Itakpe-Aladja was allocated the sum of N575m.

Other railway projects include procurement/rehabilitation of rolling stock narrow gauge at the cost of N3.734bn; insurance of locomotive and rolling stock at N500m; procurement of diesel (AGO) for the power cars and locomotive at the cost of N710m while rehabilitation of stations and other railway buildings was allocated the sum N500m.

Further breakdown of the budget showed that the sum of N500m was allocated for the procurement of track materials; procurement of rail inspection vehicles to cost N500m; rehabilitation/ repairs of railways under the line item with code 23030114 at the cost of N2.186bn while rehabilitation/repairs of office buildings under line item with code 23030121 were allocated the sum of N1bn.

The President, Major General Muhammadu Buhari (retd.), while presenting the 2023 Appropriation Bill to the National Assembly last year, said that appreciable progress had been made in the rehabilitation and completion of key projects like the 156km Lagos-Ibadan Standard Gauge Rail (and its 8.72km extension to Lagos Port); the 186km Abuja-Kaduna Standard Gauge Rail; and 327km Itakpe-Warri Standard Gauge Rail, adding that significant investment was made to finance these projects.

Buhari noted that the completed projects complemented the administration’s ongoing investments in light rail, narrow- and standard-gauge rail, ancillary facilities yards, wagon assembling plants, e-ticketing infrastructure as well as the training and development of rail engineers and other workers.

The PUNCH reported that the government planned to spend $16bn on modernising rail and port infrastructure across the country.

However, the President of the Nigerian Union of Rail Workers, Innocent Ajiji in an interview with our correspondent last year said even though railway modernisation was a good idea, Nigeria was not closed to modern railways.


Source link

Previous Post

US’ First Nuclear-Powered Bitcoin Mine Opening in 2023

Next Post

Building resilience through the SAFE STEPS D-Tech Awards

admin

admin

Related Posts

Latest News

LP chieftain defects to PDP in Ebonyi

February 8, 2023
Latest News

Nigerians will hold leaders accountable at ballot—Osinbajo

February 7, 2023
Latest News

World mourns as earthquake kills over 2,700 in Turkey, Syria

February 7, 2023
Latest News

JAMB nabs corps member, others over registration infractions

February 6, 2023
Next Post
Building resilience through the SAFE STEPS D-Tech Awards

Building resilience through the SAFE STEPS D-Tech Awards

Leave a Reply Cancel reply

Your email address will not be published. Required fields are marked *

Stay Connected test

  • 79.5k Followers
  • 23.7k Followers
  • 99 Subscribers

  • Trending
  • Comments
  • Latest
The superfood that has helped Messi, Cristiano Ronaldo and Benzema

The superfood that has helped Messi, Cristiano Ronaldo and Benzema

July 11, 2022

Shanghai lockdown: The hard life of a homeless deliveryman

May 2, 2022

#WalangPasok: Class Suspensions For September 27, 2022, Tuesday

September 26, 2022

Shanghai: Authorities fire four officials after elderly patient blunder

May 3, 2022

Realme 9i specs and renders leak ahead of January 10 announcement

172

The Oppo Pad will support 33W fast charging, gets a 3C certification

144

Google finally pushes OTA update to Pixel 6 and 6 Pro after botched December update

116

OnePlus 10 series to arrive with HyperBoost GPU tech

102
Bolstering Healthcare Leadership – Asian Scientist Magazine

Bolstering Healthcare Leadership – Asian Scientist Magazine

February 8, 2023

LP chieftain defects to PDP in Ebonyi

February 8, 2023

TLC’s ‘MILF Manor’ Contestant Was a ‘Heavy Metal Video Vixen’

February 8, 2023

Turkey earthquake: ‘This building is just a snapshot of the devastation’

February 8, 2023

Your donation will improve our site.

Recent News

Bolstering Healthcare Leadership – Asian Scientist Magazine

Bolstering Healthcare Leadership – Asian Scientist Magazine

February 8, 2023

LP chieftain defects to PDP in Ebonyi

February 8, 2023

TLC’s ‘MILF Manor’ Contestant Was a ‘Heavy Metal Video Vixen’

February 8, 2023

Turkey earthquake: ‘This building is just a snapshot of the devastation’

February 8, 2023
Facebook Twitter Instagram

Browse by Category

  • Apps
  • Asianews
  • Business
  • Business
  • Cryptocurrency
  • Education
  • Entertainment
  • Gadget
  • Gaming
  • Health & Fitness
  • Latest News
  • Lifestyle
  • Making Money
  • Market Place
  • Mobile
  • Movie
  • Music
  • News
  • Online Marketing
  • Politics
  • Science
  • Sports
  • Tech
  • Travel News
  • World

Recent News

Bolstering Healthcare Leadership – Asian Scientist Magazine

Bolstering Healthcare Leadership – Asian Scientist Magazine

February 8, 2023

LP chieftain defects to PDP in Ebonyi

February 8, 2023

  • Home
  • About us
  • Contact us
  • Guest Post
  • Paid Sponsor Post
  • Privacy Policy
  • Terms and Conditions

Copyright © 2023 Modrenews.com - All Rights Reserved.

No Result
View All Result
  • Sports
  • Latest News
  • Entertainment
  • Music
  • News
  • Tech
  • Business
  • Gadget
  • World
  • Mobile
  • Asianews

Copyright © 2023 Modrenews.com - All Rights Reserved.